Core Capabilities
SBA/8a/ANC
IT Solutions
Engineering
Services
Healthcare & Biomedical
Contact Us
 
Home
 
About Us
   
 
  Overview
  Our Staff
  Press Room
  Why Raven
  Case Study
  SBA / 8a / ANC
  White Paper
  Current Projects
 
Back
  WHY RAVEN
 
 
  • Results Driven
  • Quality Built Into Our Work Plan, Not Inserted Later
  • Excellent Past Performance
  • Customer-Service Driven To Exceed Expectations
  • Proven Track Record Of Recruiting, Retaining, And Training Qualified Personnel
  • Capability Maturity Model Implementation Experience
  • Financially Stable And Cost Conscious
  • Transparent And Seamless Transitions
  • The ability to move out and deploy quickly is of utmost importance. By significantly reducing the Pre-Award Lead Time and through Advanced Project Leadership Raven can satisfy urgent requirements effectively and expeditiously.
  • Our experienced Acquisition Staff provide advanced Contract Solutions to real time needs that are compliant and innovative and reduce valuable Procurement Action Lead Time
  • Our Project Management Group can identify unique Government Requirements and move out quickly with confidence in understanding Government needs and processes
  • We have established strong partners to assist in ramping up and delivering in a QRC environment
8(a) ANC's can receive Sole Source Awards with NO Competition, NO Prior Advertisement and NO Protest. {1}
8(a) ANC's can be awarded contracts with no upper ceiling based upon the maximum estimate of the requirement.
{1 }13 C.F.R. 124.506(b): (b) SBA may award a sole source 8(a) contract to a Participant concern owned and controlled by an Indian tribe or an ANC where the anticipated value of the procurement exceeds the applicable competitive threshold if SBA has not accepted the requirement into the 8(a) BD program as a competitive procurement. There is no requirement that procurement must be competed whenever possible before it can be accepted on a sole source basis for a tribally owned or ANC- owned concern, but a procurement may not be removed from competition to award it to a tribally owned or ANC-owned concern on a sole source basis
{1}13 C.F.R. 124.517(a), which state: "The eligibility of a Participant for a sole source or competitive 8(a) contract may not be challenged by another Participant or any other party, either before SBA or any administrative forum as part of a bid or other contract protest"
 
 
Copyright 2004 Goldbelt Raven. All rights reserved